Septic, wells and power
On-site septic, a drilled well and the power connection, coordinated from the site assessment to a working service.
On rural land there is no town water or sewer. The septic system, the well and the power line are part of the build, and on a difficult lot they can decide where everything else goes.
Septic
The septic system is designed for the site after a formal assessment of the soil, the depth to rock or water, the slope and the distances to wells and watercourses. On-site sewage systems are regulated by the province and are assessed and designed by qualified persons. We coordinate them, carry out the excavation and site work, and make sure the system goes in where and how it was designed. Read more in the septic and wells guide.
Well
Most homes up here use a drilled well. It is drilled by a certified well contractor, placed with the right separation from the septic field and from neighbours, and the water is tested before you move in. Some Nova Scotia groundwater naturally carries minerals that need treatment, and the test tells you whether yours does.
Power and connectivity
We request the electrical service from Nova Scotia Power early, because line extensions to rural lots take time to schedule. The service entrance is wired by a licensed electrician. Internet options vary widely along the Cabot Trail; we check what is realistic for your lot during the land search.
In the right order
The septic design usually has to be in place before the county issues a building permit, so this work starts in the permits stage and is built alongside the site work.
Questions
Do you design and install septic systems yourselves?
On-site sewage systems in Nova Scotia are assessed and designed by qualified persons under provincial rules. We coordinate the qualified professionals, do the excavation and site work around the system, and make sure it is placed and built as designed.
What if the soil fails the site assessment?
A difficult site does not always mean an unbuildable one. Raised beds, contour systems and advanced treatment units can work where a conventional field cannot, at a higher cost. Ideally this is known before you buy, which is why we look at it in the land check.
How long does it take to get power to a rural lot?
It depends on how far the lot is from an existing line and on Nova Scotia Power's schedule. We request the service early in the project so it does not hold up the build.