Building in Neils Harbour and New Haven
Working fishing communities on the Atlantic side between Ingonish and Cape North, with rocky headlands, open exposure to the sea and lots close to the water.
Neils Harbour and New Haven sit on the open Atlantic between Ingonish and Cape North, on the northeastern stretch of the Cabot Trail. They are working fishing communities, with houses close to the harbours and the shore, and some of the most exposed building sites on the northern trail.
What building here involves
- Exposure. There is little between these lots and the open Atlantic. Roofing, cladding, windows and fastening have to be chosen for wind and salt, and the orientation of the house matters. See custom homes.
- Rock. Bedrock is often close to the surface. That affects foundations, the driveway and especially the septic system, which may need to be raised or specially designed. The septic and wells guide explains the options.
- The shoreline. Lots near the water need a careful look at erosion and storm surge before anything is designed. Read the guide to building on the coast.
- Small lots. Older lots in the villages can be tight, which makes the distance rules between the septic field, the well and the property lines harder to meet.
Services and permits
Both communities are in Victoria County, under the county’s land-use by-law, with development and building permits issued by the Eastern District Planning Commission (EDPC). The septic approval or notification comes from the province, usually first. We check soil depth, separation distances and access as part of the land search, so the constraints are known before you commit.
What we do here
The full range, from the site check to the keys: site work and foundations on rock, septic, well and power, new homes and renovation-scale rebuilds, and buildings for fishing and harbour businesses through commercial construction.
Questions
Is it hard to put a septic system in near Neils Harbour?
It can be. Rock near the surface and limited soil depth are common along this part of the coast, which can mean a raised or specialized system. A site assessment by a qualified person settles it, and it is best done before you buy.
Who issues building permits in Neils Harbour and New Haven?
Both are in Victoria County, where development and building permits are issued by the Eastern District Planning Commission (EDPC). The on-site sewage approval or notification from the province is usually needed first.
Tell us about your land, or let us find it.
Seven short questions, about two minutes. A person reads every enquiry and gets back to you.