Design coordination and permits
Design coordination, a fixed scope, a budget and a schedule, and every county permit and provincial approval the project needs.
Illustrative · durations vary by site and season
This is the stage where the project stops being an idea and becomes something that can be priced and built. It ends with a fixed scope, a budget, a schedule and the permits in hand.
Design, checked against the site
Whether you bring an architect’s drawings or we bring in a designer, the design is checked against the site report, the budget and the building code before anything is applied for. Changes are cheapest on paper.
The approvals, in order
Northern Cape Breton sits in two counties, Victoria and Inverness, each with its own land-use by-law. Development and building permits for both are issued by the Eastern District Planning Commission (EDPC). Typically:
- On-site sewage. The septic design and the provincial approval or notification, which usually comes before the building permit. See septic, wells and power.
- Road access. A permit for a new driveway entrance onto a provincial road.
- Environment. Approvals for work near watercourses or in wetlands, where they apply.
- Development permit. From EDPC, confirming the project meets the county’s land-use by-law.
- Building permit. From EDPC, with the drawings, site plan and septic approval.
- Commercial projects. Fire safety and accessibility reviews where they apply.
The guide to building permits goes through each one in detail.
What you get
A fixed scope, a budget broken down by stage and a schedule planned around the season. If you are building from away, every decision you need to make is laid out with its cost and a date it is needed by. Then the site work can begin.
Questions
What permits do I need to build a house in Cape Breton?
At minimum a development permit and a building permit, which in both Victoria and Inverness counties are issued by the Eastern District Planning Commission, and on a rural lot an approval or notification for the on-site sewage system from the province, which usually comes first. A new entrance onto a provincial road needs an access permit, and work near watercourses or wetlands can need a provincial approval. The guide to building permits explains each one.
Who draws the plans?
Your own architect or designer, or one we bring in. The drawings have to meet the Nova Scotia Building Code and include what the county needs for the permit application.
How long do permits take?
It varies by county, by season and by how complete the application is. Applying with complete drawings and the septic approval in hand is the best way to keep it short, and we track every application until it is issued.